HomeScience BackgroundProject SchedulePeopleLocationImages

Deployment Trip Photos ( April 4th - April 28th, 2004 )

 

        Pre-Deployment                          Ship-board                             Deployment                        Post-Deployment

 

Pre-Deployment Photos

Buoy in NIWA stores, awaiting electronics package and testing

 

Two stacks of electronics in mu-metal housing.  Blue LEDs represent compact flash readers

 

Buoy outside, pointing north for optimal GPS satellite detection

 

Different angle, showing top plate, including camera housing, wind speed sensor, and light beacon

 

Close-up view of top plate

 

Other side of Buoy, showing support structure while laying on its side

 

Noah with sealed mu-metal canister

 

Noah preparing to seal mu-metal canister in the well, and route cables

 

Installing mu-metal canister...

 

Securing mu-metal in well with specialized foam padding

 

Boat lettering installed on side of buoy, with important contact information

 

Full view of Buoy with contact information

 

Umran with newly labeled Buoy

 

Team with newly labeled Buoy

 

Side view of electronics, with very messy cabling.  The wooden slats shown are holding the VLF antennas taut, and in place

 

Close-up of patch panel and connected cables

 

Another view of patch panel with cabling, now showing both sides

 

Electronics (power supply box, and pre-amp box) with now slightly neater cabling

 

Sealing the electronics well...

 

 

Sealed well...

 

 

Sealing the exterior hatch...

 

 

 

Ship-Board Photos

 

Craning the Buoy onto the Tangaroa...

 

Buoy lifting over side of ship...

 

 

Still moving...

 

 

Almost on the ship...

 

Lowering onto holding structure...

 

Still lowering...

 

 

Strapping it down to the ship

 

 

Freshly painted Buoy

 

Team with Buoy.  From left to right: Evans Paschal, Rick Cole, Mark Golkowski, Jeff Chang, Erin Selser, Noah Reddell, Pierre Smit
Buoy strapped in and ready to go...

 

Reeling mooring onto the wench, beginning with polypropylene segment

 

Still reeling mooring, now on the nylon segment

 

Now reeling on the wire rope...

 

 

Finishing up the wire rope segment...

 

Buoy strapped on to boat...

 

 

Night-time view of buoy from bridge, just before deployment

 

 

 

 

Deployment Photos

 

Craning Buoy over side of ship

 

Getting closer to edge...

 

Going over side...

 

 

Lowering into ocean...

 

 

Still lowering...

 

Almost touching the water...

 

 

First splash...

 

In the water!!!

 

In the water

 

 

In the water, with one remaining tag line (to be removed later by Noah and the small boat)

 

In the water, with a blink from the light beacon

 

 

Preparing for anchor release...

 

Final picture of anchor

 

 

 

Post-Deployment Photos

 

Close-up view of Buoy in water

 

Another shot of Buoy in water

 

Buoy with Tangaroa

 

Tangaroa getting closer...

 

...and closer...

 

... and closer...

 

Tangaroa pulling up next to the Buoy

 

Tangaroa alongside Buoy

 

Tangaroa and Buoy, different angle

 

Tangaroa and Buoy moving apart

 

Tangaroa as viewed from the Buoy

 

Buoy as viewed from the Tangaroa

 

Buoy as seen through ship's A-Frame

 

Noah's farewell to the Buoy